- Client
- Somebody real
- Tool
- Whatever fits
- Dates
- Aug 19 – May 7
The Open Work Order
Real work doesn't arrive on a schedule. Theater needs a poster in October. The front office needs a form that stopped making sense in 2011. ASB remembers a week out. Somewhere on this campus, all year, there is an adult with a design problem and no designer.
You take one. Requests come to the job board in the Tech Center and you claim what you want; if you haven't claimed anything by February, I'll assign you one. You work in pairs, because two people are more likely to survive a client who goes quiet. There are exactly two dates I enforce — a signed work order by Oct 30, and shipped by May 7. Everything between those is between you and them.
- Theater — show posters, programs, title cards, lobby boards
- Film — title sequences, key art, festival submission graphics
- ASB — dance and rally campaigns, spirit week, election materials, merch
- Admin & the front office — forms, signage, handbooks, anything printed in 2011 and never touched since
- Athletics — schedule posters, team graphics, banners
- Counseling — college and career night, informational one-sheets that people actually read
- Band, choir, clubs — concert posters, logos, fundraiser materials
- Game Dev — the room you're already in, if they need something outside of April
That list isn't a menu — it's who has asked before. If somebody on this campus needs something and they're not on it, bring me the request and we'll write the work order.
- Signed work order — the studio intake form, filled out sitting with the client, not guessed at. Signed copy to me by Oct 30.
- Two proposed directions, presented to them
- The deliverable itself, to the spec they actually need
- Handoff package — final files, formats, and a short "how to use this"
- Postmortem — required either way, and the only deliverable if the client vanishes